Installation and Operation ManualD25D, D50D, D70DDehumidifier920-198-10 (3-10)ModelsD25D Volts: 115/60Hz Capacity: 25 Pints Moisture Removal: 25 Pint/
10920-198-10MAINTENANCEFor safety reasons, make sure the unit is unplugged before servicing or cleaning.Cleaning the shellSTEP 1. Wipe the she
11920-198-10IN CASE OF EMERGENCYIf a problem occurs, unplug the unit and contact a qualied servicing center immediately. Do not disassemble the unit
12920-198-10FIRST YEARFriedrich Air Conditioning CompanyP.O. Box 1540San Antonio, TX 78295210.357.4400www.friedrich.comDEHUMIDIFIERSLIMITED WARRANTYAN
13920-198-10Friedrich Air Conditioning Co.Post Ofce Box 1540 • San Antonio, Texas 78295-15404200 N. Pan Am Expressway • San Antonio, Texas 78218-5212
2920-198-10Congratulations!Thank you for your decision to purchase the Friedrich Dehumidier. Please read thoroughly of this Installation and Operati
3920-198-10DESCRIPTION OF COMPONENTSFRD001DRAIN PUMP OUTLET(ONLY ON 50 AND 70 PINT MODELS)CONTINUOUSDRAINAGE OUTLETDEHUMIDIFIEDDRY AIR VENTCONTROL PAN
4920-198-10STEP 1. Remove unit from carton and inspect.STEP 2. Remove accessories from drain bucket.STEP 3. Install Roll Casters (D25D models
5920-198-10STEP 1. Place the unit in an upright position on a at, steady, stable and heat resistant surface. Make sure there is nothing ammable or
6920-198-10OPERATING DO'S AND DON'TSDo not place anything on top of the unit or control panel (See Figure 8). FRD007Figure 8Do not place any
7920-198-10FRD017Figure 14FRD018Figure 15Do not put any foreign objects into the unit, it is dangerous and will result in damage to the unit (See Figu
8920-198-10To save having to periodically empty the drain bucket, this unit can be congured for continuous drainage. You can use the supplied drain h
9920-198-10Drain Hose RoutingsWhen using the function of continuous drainage, the drain hose must be placed horizontally below the drainage hole (See
Comments to this Manuals